Prior to each PIT, the order for this to be held is issued by the chief executive officer. The order specifies the basic organizational arrangements required for the site physical inventory to be taken. Among other things, the following is determined:
∙the MBAs in which the PIT will be implemented;
∙the names of the PIT commission members;
∙the dates for preparing accounting data, equipment and instrumentation required for the inventory taking;
∙the dates for preparing the items to be inventoried for checking;
∙the inventory taking dates and the submission date of the PIT reports.
To prepare, hold and analyze the results of the NM physical inventory taking, the following PIT commissions are formed at the enterprise: a central inventory-taking commission (CITC) and, within the site divisions, working inventory-taking commissions (WITC).
The WITCs plan the PIT, prepare the MBAs and implement the PIT within the specified dates. During the inventory talking the WITC members:
∙detect and record the shortcomings in accounting, storage and utilization of NM, and make proposals on eliminating these;
∙bring to the notice of executive staff the detected shortcomings in accounting and storage of NM.
The CITC shall provide procedural guidance for the inventory taking to be organized and implemented within the enterprise’s material balance areas (coordination of works and counseling). Essential to the PIT implementation are safety and radiation safety precautions. These should be therefore defined in the respective inventory-taking instruction and approved by the organization’s nuclear and radiation safety services.
A division’s WITC shall be made up of skilled personnel having access to operations with NM, as well as to accounting and technical records. Normally, a WITC comprises:
∙the chairman (head of division);
∙representatives of the nuclear safety and radiation monitoring services;
∙representatives of the A&C system computerized accounting service;
∙physical measurement and statistical experts;
∙a representative of the CITC;
∙representatives of the security service and other members.
The custodian shall take part in preparing the MBA for the PIT and shall be present during the commission’s work. However, he/she shall not be a member of the PIT commission.